The Chedi Katara Hotel in Doha, Qatar
FEATURED HOSPITALITY PROJECT

The Chedi Katara Hotel, Doha

Comprehensive installation works covering CCTV, access control, ICT structured cabling, fiber optics, disabled toilet alarm, water leak detection, GRMS, BGM, lighting control and related ELV systems.

Location: Doha, Qatar Sector: Hospitality Scope: ICT & ELV Installation
PROJECT OVERVIEW

Integrated low-voltage and communication infrastructure

The project involved coordinated installation, cable pulling, labeling, termination, testing and commissioning activities across multiple systems. The work included substantial copper and fiber infrastructure together with security, guest-room, audio and life-safety related systems.

NexGrid's scope focused on organized execution, accurate terminations, system readiness and dependable project handover across a demanding hotel environment.

DETAILED SCOPE OF WORK

Installation quantities by system

The quantities below are taken from the supplied project schedule.

No.DescriptionQuantity
CCTV
1Camera installation including cable pulling, labeling, terminations and testing322
2Fiber cable splicing and testing, per core200
3Fiber optic cable pulling, per meter5,600 m
ACCESS CONTROL SYSTEM
4Card reader, magnetic lock and access-control door accessories including cable pulling, labeling, termination and testing80 points
5Panic button installation7
6Door contact installation43
7Access-control panel installation50
8Intercom installation12
9Gate barrier installation including cable pulling, labeling, termination and testing; civil work excluded10
ICT
10Data-point installation including cable pulling, labeling, termination and cable testing1,182 points
11Data-point labeling, termination and cable testing668 points
12Fiber optic splicing and testing, per core256
13Fiber optic cable pulling, per meter29,500 m
14CAT-3 cable pulling3,350 m
DISABLED TOILET ALARM
15Device installation including cable pulling, labeling, termination and cable testing10
16ADA chalet two-bedroom installation1
17Main panel installation in the security room1
18ADA chalet two-bedroom to hotel cable run1,900 m
WATER LEAK DETECTION SYSTEM
19Water-leak detection cable installation per point location in the hotel39
20Water-leak detection main panel installation1
GRMS
21Enclosure installation per room type91
22Control-point/light-switch installation including cable pulling and termination610
23Control-point/light-switch installation including termination966
24Bell installation59
BGM
25Indoor BGM speaker installation including cable pulling139
26Outdoor BGM speaker installation including cable pulling19
LIGHTING CONTROL SYSTEMS
27Lighting-system control enclosure installation52
28Sensor and control-point switch installation including cable pulling150
29Standalone sensor installation and cable termination only100
GRE
30Speaker cable pulling59